Capital rationing: a situation in which there is not enough finance (capital) available to undertake all available positive NPV projects. Therefore, capital has to be rationed.

1.Types of Capital Rationing
Capital rationing: a situation in which there is not enough finance (capital) available to undertake all available positive NPV projects. Therefore, capital has to be rationed.
Hard capital rationing: the capital markets impose limits on the amount of finance available (e.g. due to high perceived risk of the company).
Soft capital rationing: the company sets internal limits on finance availability (e.g. to encourage divisions to compete for funds).
Single-period capital rationing: capital is in short supply in only one period.
Multi-period capital rationing: capital is rationed in two or more periods.
2.Single-period Capital Rationing
If projects are divisible (i.e. any portion of a project may be undertaken) the correct method is to calculate a profitability index for each project and then to rank them according to this measure.
Profitability index = Net Present Value/ Capital Invested
If projects are non-divisible there is no need to calculate the index above—the optimal investment plan can only be found using trial and error (i.e. trying different combinations of projects until the maximum possible NPV is found).
Mutually exclusive projects—where two or more particular projects cannot be undertaken at the same time (e.g. because they use the same land). In this case, use the following method:
Divide projects into groups; with one of the mutually exclusive projects in each group.
Calculate the highest NPV available from each group (assume projects are divisible unless told otherwise).
Choose the group with the highest NPV.
3.Multi-period Capital Rationing
If investment funds are expected to be restricted in more than one period, then neither the profitability index nor trialand-error approaches can be used, as they do not take into account the restriction on finance in future periods.
If projects are divisible, then a linear programming model must be formulated and solved. If there are only two projects, the solution can be found graphically. Three or more variables require a computer solution.

吐槽

對不起!讓你吐槽了

/500

上傳圖片

    可上傳3張圖片

    2001-2025 上海金程教育科技有限公司 All Rights Reserved. 信息系統(tǒng)安全等級:三級
    中央網(wǎng)信辦舉報(bào)中心 上海市互聯(lián)網(wǎng)舉報(bào)中心 不良信息舉報(bào)郵箱:law@gfedu.net
    滬ICP備14042082號 滬B2-20240743 通過ISO9001:2015 國際質(zhì)量管理體系認(rèn)證 滬公網(wǎng)安備31010902103762號 出版物經(jīng)營許可證 電子營業(yè)執(zhí)照

    掃描二維碼登錄金程網(wǎng)校

    請使用新版 金程網(wǎng)校APP 掃碼完成登錄

    登錄即同意金程網(wǎng)校協(xié)議及《隱私政策》